Thursday, November 18, 1999

Gosh, it’s almost Friday already. We still have biweekly sex, although sometimes 3-4 weeks pass in between sex. I’m glad I’ve gotten used to this and I wish to hell I could know I’ll get used to the hunger once I begin dieting, but it never goes away. Not for me, it doesn’t. Anyway, whatever we do sex-wise, he won’t be squirting this time. Not with me close to mid-cycle and with his cumming just two weeks ago. It still strikes me as odd how God sees to it he doesn’t cum during mid-cycle, although he has a few times. That was quite some time ago, though. I know part of it is Tom himself, but if God can do anything, why put such effort into it and work at the timing and all that? I still say - why not just see to it that I need a hysterectomy? Why work at it needlessly?

Again, not a sound since we returned around 5:00. I let the housekeeper do her thing today, but she didn’t change our sheets. That’s OK. The stuck-on booger is way up by where the bed meets the headboard. We noticed this yesterday if this is really what it is.

APS finally came out today to do their thing, but once again, we’re waiting on fucking Gravity. He needs to get his ass out there and get the meter box up. I’m so damn sick of stupid incompetent little shits! One person says one thing while someone else says another, then Hilda says she doesn’t know who’s doing what. She doesn’t know? Then what the fuck is she in this business for? If she doesn’t know who’s doing what by now, she’s got a real problem. How many years has she been in this business? Well, I think it’s about time people start figuring out who’s doing what and do it! If Gravity wants his money and if people don’t want to get sued, they better get their asses in gear and us in that house by the 1st as the contract states.

One of the guys from APS, who has the same model we do, is in the process of suing Palm Harbor for similar problems we’ve got like with all the staples showing, the botched island trim job, the half-assed baseboard job in the entryway, and the crooked bar. Even Brian, who’s the only one who’s been dedicated so far, noticed the island trim, and he suggested I mention it during the final walk-through. Oh, I will. I’m not gonna necessarily have them fix things, cuz that’d just delay us from getting in there (we’ll fix their fuck-ups ourselves even though we shouldn’t have to. We paid them to do it) However, I am gonna point out these flaws to them. I understand no one and nothing is perfect, but this is a little overkill.

Also, why do people have to die that are associated with those working for us? First Gravity’s mother-in-law dies and now the carpet layer’s friend dies. The carpet would’ve been done today if the guy’s friend hadn’t been killed on a motorcycle. Hilda says it’d be no problem getting another carpet layer if she has to. Let’s hope not, although I still can’t understand why so many different people have to be involved. APS has to be APS, but why can’t Palm Harbor take care of their house’s setup as well? And the septic? We shouldn’t have bothered with separate contractors, but I guess it’s cuz we went through Steven and not Palm Harbor directly.

So we still need the septic filled in after it’s inspected. The electric box needs inspecting. We need carpet. And we need a fucking well, too. Where the hell is the well permit we should’ve gotten two weeks ago?

Again, I can’t wait to get into that house and away from people and their stupidity!!!

Our first stop of the day, after Tom got off work, of course, was to Home Bass. He couldn’t find the tool he needs for the rammed earth wall he wants to make. This is the one to keep loose dogs, coyotes, etc. out, and cut down sound, but we’ll still put up the barbed wire perimeter fence.

We looked at outdoor plants/trees, sheds, decorative light switches, and indoor/outdoor mats. Their indoor mats were a bore, but I got a nice flowery outdoor mat cut around the shape of the flowers.

We also went to Game Works and accumulated about 1400 tickets. Not enough for a 3000-ticket lightning lamp. So I got three 75-ticket velour bears and now I have a yellow one, an orange one, a red one, and a green one (they were out of purple ones) and I have a voucher for 1185 tickets. So, two more trips and we’ll have the lamp. It’s not nearly as cool as the lamp I saw at Home Bass, though, which was amazingly only $50. It’s a stick lamp that’s about 4’ high with water bubbling in it and it changes colors, too.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.